Block Paving Calculator (UK)

Last updated: 12 August 2026

Work out how many block pavers you need for a driveway or patio, plus the MOT Type 1 sub-base, laying course sand and kiln-dried jointing sand.

Quick answer: a standard 200 × 100mm block covers 0.02 m², so 50 blocks per square metre. A 30 m² driveway needs about 1,575 blocks (with 5% cuts), 10 tonnes of MOT Type 1 and 2 tonnes of sharp sand.
Advert

How the calculation works

Blocks per square metre comes from the block face area — a 200 × 100mm block is 0.02 m², so 50 fit in a square metre. We add a cutting allowance because edges, curves and herringbone patterns all generate offcuts.

The sub-base is calculated at your chosen depth using MOT Type 1 at about 2.2 tonnes per cubic metre compacted. The laying course assumes 50mm of sharp sand, and jointing sand roughly 5kg per square metre brushed into the joints.

Driveway build-up

LayerDrivewayPatio / path
Excavation depth~250mm~200mm
MOT Type 1 sub-base150mm compacted100mm compacted
Sharp sand laying course50mm50mm
Block thickness50–60mm50mm

Edge restraints on a haunched concrete bed are essential — without them the blocks creep outwards and the pattern opens up. Falls of about 1:60 should run away from the property.

Frequently asked questions

How many block pavers are in a square metre?

A standard 200 x 100mm block covers 0.02 square metres, so there are 50 blocks per square metre. 200 x 200mm blocks give 25 per square metre and 200 x 125mm give 40.

How much sub-base do I need for a driveway?

150mm of compacted MOT Type 1 is the standard for a domestic driveway, which is about 0.33 tonnes per square metre. A 30 square metre driveway needs roughly 10 tonnes.

How much sand do I need for block paving?

Allow 50mm of sharp sand for the laying course — about 0.085 tonnes per square metre — plus roughly 5kg per square metre of kiln-dried sand brushed into the joints once laid.

What wastage should I allow for block paving?

Allow 5% for a simple rectangular area and 10% for curves, circles or herringbone patterns, which generate far more cuts at the edges.

Do I need planning permission for a driveway?

In England, permission is not usually needed if the surface is permeable, or if rainwater can drain to a border or soakaway within your property. Laying an impermeable surface over 5 square metres that drains to the road normally does require permission — check with your local authority.

Related calculators

Aggregate Calculator

MOT Type 1, gravel, sand or topsoil — tonnes and bulk bags.

Concrete Calculator

Slab and footing volumes in m³, with bag counts or ballast & cement.

Estimates are for guidance only. Material dimensions, densities and coverage vary by supplier — always confirm quantities before ordering, and consult a qualified professional for structural work.