How the calculation works

Volume = area × thickness, plus 10% for consolidation and wastage. We split that volume by your mix ratio, then convert sand to tonnes at about 1.7 t/m³ and cement to 25kg bags at a bulk density around 1,440 kg/m³.

A 4:1 sharp sand to cement mix is the traditional UK floor screed. Screed is semi-dry — it should hold together when squeezed but not be sloppy. Too much water weakens it and causes curling at the edges.

Minimum screed thickness

Screed typeMinimum thicknessNotes
Bonded to concrete25–50mmSlab must be clean and primed
Unbonded (on DPM)65mmSeparating membrane below
Floating (over insulation)65–75mm75mm where underfloor heating is fitted
With underfloor heating65–75mmMeasured above the pipes

Drying times

The rule of thumb is one day per millimetre of thickness for the first 50mm, then longer for anything deeper — so a 50mm screed needs about 50 days before impermeable floor coverings go down. Force-drying too early causes cracking. Always test moisture with a hygrometer before laying vinyl, wood or resin.

Frequently asked questions

What is the mix ratio for floor screed?

4 parts sharp sand to 1 part cement is the standard UK floor screed mix. Use 3:1 for thinner or more heavily loaded sections. The mix should be semi-dry — holding together when squeezed but not wet or sloppy.

How thick should floor screed be?

Minimum 25 to 50mm bonded to a concrete slab, 65mm unbonded over a membrane, and 65 to 75mm floating over insulation. With underfloor heating, thickness is measured above the pipes and is usually 65 to 75mm.

How much sand and cement do I need for screed?

For a 4:1 mix at 50mm thick, allow roughly 0.075 tonnes of sharp sand per square metre. A 20 square metre floor needs about 1.5 tonnes of sharp sand and 13 x 25kg bags of cement, including a 10% wastage allowance.

How long does screed take to dry?

Roughly one day per millimetre of thickness up to 50mm, then longer for deeper sections — so a 50mm screed takes about 50 days before impermeable floor coverings can be laid. Test with a hygrometer rather than guessing.

What is the difference between screed and concrete?

Screed uses sharp sand and cement with no coarse aggregate, giving a smooth levelling layer for floor finishes. Concrete contains ballast and is structural. Screed is not designed to carry structural loads on its own.

Related calculators

Concrete Calculator

Slab and footing volumes in m³, with bag counts or ballast & cement.

Flooring Calculator

Laminate packs, underlay rolls and the trims people forget.

Tile Calculator

Tiles, adhesive and grout for floors and walls, with wastage.

Estimates are for guidance only. Material dimensions, densities and coverage vary by supplier — always confirm quantities before ordering, and consult a qualified professional for structural work.